{"id":160,"date":"2012-10-26T11:11:00","date_gmt":"2012-10-26T16:11:00","guid":{"rendered":"http:\/\/blogs.uml.edu\/orientation-ambassadors\/2012\/10\/26\/south-campus-advancements\/"},"modified":"2012-10-26T11:11:00","modified_gmt":"2012-10-26T16:11:00","slug":"south-campus-advancements","status":"publish","type":"post","link":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/2012\/10\/26\/south-campus-advancements\/","title":{"rendered":"South Campus Advancements"},"content":{"rendered":"<div style=\"text-align: center\"><span style=\"font-family: Arial, Helvetica, sans-serif;font-size: large\"><b>The Final Installment<\/b><\/span><\/p>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\">Today is the last installment of the epic 3 part series I have been working on. Here are the changes and projects occurring to South Campus. South campus has made many strides in the past years involving the new O&#8217;Leary Library renovation, the<\/span><span style=\"font-family: Arial, Helvetica, sans-serif\">&nbsp;renovations to the Comley Lane Theater, and last but not least the<\/span><span style=\"font-family: Arial, Helvetica, sans-serif\">&nbsp;installment of Starbucks, Subway, and The Hawk&#8217;s Nest. All of those improvements to South campus have proven to be great but now it&#8217;s time to focus on the big projects! Here we go!<\/span><\/div>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: small\"><span style=\"font-size: x-small\"><span style=\"font-size: small\"><br \/><\/span><\/span><\/span><\/span><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: small\"><span style=\"font-size: x-small\"><span style=\"font-size: small\"><img loading=\"lazy\" height=\"170\" id=\"il_fi\" src=\"http:\/\/www.c7a.com\/wp-content\/uploads\/2012\/08\/UML-Building-View.jpg\" style=\"padding-bottom: 8px;padding-right: 8px;padding-top: 8px\" width=\"400\" \/><\/span><\/span><\/span><\/span><\/div>\n<div style=\"text-align: center\"><span style=\"font-family: Arial, Helvetica, sans-serif;font-size: x-small\">&nbsp;The Health and Social Sciences Building<\/span><\/div>\n<div style=\"text-align: center\"><\/div>\n<div style=\"text-align: left\"><span style=\"font-size: small\"><span style=\"font-family: Arial, Helvetica, sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\"><br \/><\/span><\/span><\/span><\/span><span style=\"font-size: small\"><span style=\"font-family: Arial, Helvetica, sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">&nbsp;<span style=\"font-size: small\">Say  hello to the first new building on south campus in over 30 years! This  new building will be the home to health, criminal justice, psychology  majors. This new building will ready for the Spring academic semester. The UML website describes this building as:<\/span><\/span><\/span><\/span><\/span><\/div>\n<div style=\"text-align: left\"><\/div>\n<div style=\"text-align: center\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: small\"><span style=\"font-size: x-small\"><span style=\"font-size: small\"><span style=\"font-size: small\"><br \/><\/span><\/span><\/span><\/span><\/span><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: small\"><span style=\"font-size: x-small\"><span style=\"font-size: small\"><span style=\"font-size: small\">&#8221; The new Health and Social Sciences building will be four stories high  and span 69,000 gross square feet. It will house seven classrooms, 16  seminar\/project rooms, eight conference rooms and 72 faculty offices.       <\/span><\/span><\/span><\/span><\/span><span style=\"font-family: Arial,Helvetica,sans-serif\">The four-story atrium lobby space with skylights is built in  response to requests from members of the University community for space  that promotes student and faculty interactions.&#8221;<\/span><\/p>\n<div style=\"text-align: left\"><span style=\"font-family: Arial,Helvetica,sans-serif\">Fun  Fact:&nbsp; 75 percent of regularly occupied spaces receive natural light.  40 percent of construction materials manufactured within 500 miles. 75  percent of construction debris recycled. Lastly, although you can&#8217;t see it now, there is going to be a very attractive green space area outside of the building.&nbsp;<\/span><\/div>\n<div style=\"text-align: left\"><\/div>\n<div style=\"text-align: center\"><\/div>\n<div style=\"text-align: center\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><img loading=\"lazy\" height=\"288\" id=\"il_fi\" src=\"http:\/\/www.uml.edu\/facilities\/Capital-Improvements\/ci-images\/buildings\/riverview-suites.jpg\" style=\"padding-bottom: 8px;padding-right: 8px;padding-top: 8px\" width=\"400\" \/><\/span><\/div>\n<p><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\">Riverview Suites<\/span><\/span><\/p>\n<div style=\"text-align: left\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">Although  this project won&#8217;t be finished for quite some time. &nbsp;It will be  located on South Campus on Marginal Street. It will however have  convenient access to South campus. So don&#8217;t be afraid. According to the  UML website:&nbsp;<\/span><\/span><\/span><\/div>\n<div style=\"text-align: left\"><\/div>\n<div style=\"text-align: center\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">&#8220;<\/span><\/span><\/span><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">Riverview Suites, a six-story, 173,000-square-foot residence hall near  South Campus will feature suites with two or three double-occupancy  bedrooms, a kitchen and a common area. The two-bedroom suites will  include one full bathroom, while the three-bedroom suites will have two  full bathrooms. &#8220;<\/span><\/span><\/span><\/div>\n<div style=\"text-align: center\"><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">Fun Fact: Rumor has it there will be a fully functional rec center in this new building.<\/span><\/span><\/span><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial,Helvetica,sans-serif\"><span style=\"font-size: x-small\"><span style=\"font-size: small\">&nbsp;<\/span>&nbsp;<\/span> <\/span><\/div>\n<p><img loading=\"lazy\" height=\"397\" src=\"http:\/\/www.uml.edu\/system\/aspx\/formattedimage\/cornerimage.aspx?u=\/Images\/south-garage-feature_tcm18-65027.jpg&amp;type=thirdlevel\" width=\"400\" \/><br \/><span style=\"font-family: Arial, Helvetica, sans-serif;font-size: x-small\">South Campus Garage<\/span><br \/><span style=\"font-family: Arial, Helvetica, sans-serif;font-size: x-small\"><br \/><\/span><\/p>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\">The new South campus garage that is being&nbsp;constructed&nbsp;is part of the University&#8217;s solution to what was once a parking problem. This is the second garage the University has built in one year. This parking garage is a little bit bigger than its relatives on north and east campus. The University website describes this garage as:<\/span><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div style=\"text-align: center\"><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\">&#8220;The South Campus garage will provide parking spaces for 762 cars on South Campus. Tucked between Mahoney Hall and Riverview Parking Lot, the garage will be conveniently located to all South Campus facilities. The six-and-one-half level open-parking facility is a 191,000-square-foot structure that will provide pedestrian access via a large, glass-enclosed stairway located at the north end of the building.&#8221;<\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\">Fun Fact: There will still be a parking lot outside from this garage. I remember teaching one of my friends how to drive in this parking lot this summer during one of the evenings. She nearly crashed my car&#8230;<\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\">Well, that&#8217;s all folks. Those are the&nbsp;publicly&nbsp;released projects and developments of the University. Beware, rumors are circulating around the fate of and renovations of many more buildings on campus. Be careful what you believe, but bear in mind that if you know someone (perhaps even me) with insider information to listen carefully. By 2020 Lowell and the UML campus will look&nbsp;astonishingly different than how it looks today. I hope you are as excited as me!<\/span><br \/><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><span style=\"font-family: Arial, Helvetica, sans-serif\">In case you missed the other installments here they are:<\/span><br \/><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><span style=\"font-family: Arial, Helvetica, sans-serif\">East Campus:&nbsp;<\/span><a href=\"http:\/\/www.umlorientationambassadors.blogspot.com\/2012\/10\/a-changing-east-campus.html\">http:\/\/www.umlorientationambassadors.blogspot.com\/2012\/10\/a-changing-east-campus.html<\/a><\/p>\n<p><span style=\"font-family: Arial, Helvetica, sans-serif\">North Campus:&nbsp;<\/span><a href=\"http:\/\/www.umlorientationambassadors.blogspot.com\/2012\/10\/umass-lowell-progressive-change.html\">http:\/\/www.umlorientationambassadors.blogspot.com\/2012\/10\/umass-lowell-progressive-change.html<\/a><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div style=\"text-align: left\"><span style=\"font-family: Arial, Helvetica, sans-serif\">-Tim Brown&nbsp;<\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<div><span style=\"font-family: Arial, Helvetica, sans-serif\"><br \/><\/span><\/div>\n<p><span style=\"font-size: small\"><span style=\"font-family: Arial, Helvetica, sans-serif\"> <\/span><\/span><\/div>\n<div style=\"text-align: center\"><span style=\"font-size: small\"><span style=\"font-family: Arial, Helvetica, sans-serif\">&nbsp; <\/span><\/span><\/div>\n<div style=\"text-align: center\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>The Final Installment Today is the last installment of the epic 3 part series I have been working on. Here are the changes and projects occurring to South Campus. South campus has made many strides in the past years involving &hellip; <a href=\"https:\/\/blogs.uml.edu\/orientation-ambassadors\/2012\/10\/26\/south-campus-advancements\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":15,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/posts\/160"}],"collection":[{"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/users\/15"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/comments?post=160"}],"version-history":[{"count":0,"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/posts\/160\/revisions"}],"wp:attachment":[{"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/media?parent=160"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/categories?post=160"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.uml.edu\/orientation-ambassadors\/wp-json\/wp\/v2\/tags?post=160"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}